- Architectural Review Board
Architectural Review Board - July 16, 2026
Palo Alto’s architecture board formed a committee to review wireless design rules as the city anticipates possible AT&T right-of-way applications.

Listen to this AI-generated audio version
Board forms committee to refine wireless design rules

Downtown North neighborhood, Palo Alto, CA
Palo Alto’s Architectural Review Board formed a two-member ad hoc committee to examine wireless-facility design standards and recommend when applications should receive staff review or return to the full board. Vice Chair Kendra Rosenberg and Commissioner David Hirsch will review the city’s former objective standards and possible design and process changes. The board took no formal vote and adopted no new standards.
City Council repealed the previous objective wireless standards in May 2025 and directed the board to help develop replacements. Under a temporary ordinance running through June 2027, all Tier 2 and Tier 3 facilities go to the board. Members discussed allowing staff-level approval for routine installations that meet clear parameters, particularly because Tier 2 applications face a 60- to 90-day review deadline. Tier 3 applications have a 150-day deadline. No future review threshold was settled.
The board focused its design discussion on concealment, colors, equipment size, cable management, landscaping and compatibility with poles and surrounding streets. AT&T representatives sought predictable criteria and described options including equipment shrouds, concealed cabling and underground disconnect equipment. They said putting radio equipment underground could require large vaults and create maintenance, ventilation, utility-conflict and tree-root challenges.
A separate council-directed study concerns possible setbacks of 100 feet from homes and 1,500 feet from schools and daycares. Staff said no consultant had been retained and preliminary mapping suggested that a 100-foot residential setback would be difficult to apply in Downtown North and elsewhere. Staff also anticipated about 11 or 12 AT&T public-right-of-way sites, initially involving Downtown North and University South, but said no formal applications had been submitted and the sites’ tiers had not been determined.
Staff will give the board drawings and information from previous wireless approvals. The committee’s recommendations were expected to return for discussion on Aug. 6, although the meeting record did not establish whether the board would finish its recommendations that day. Staff ultimately plans to prepare revised standards and process recommendations for consideration by the Planning and Transportation Commission and City Council.
Board edits work plan as final vote remains unclear

3781 El Camino Real
Board members revised the proposed 2026-27 work plan and annual report before considering a motion to approve the documents as amended. The available record captures yes votes from David Hirsch and Yingxi Chen but ends before the full roll call and final result. It therefore does not establish that the board approved the work plan for submission to City Council.
The revisions included a shorter mission statement focused on maintaining and enhancing Palo Alto’s aesthetic environment and a proposal to rename the purpose statement as a method statement. Members also debated giving greater emphasis to optional preliminary reviews before applicants seek formal approval. Staff said that option is already available and had been used previously, while Hirsch said he had not seen such a review during his seven years on the board and wanted stronger encouragement for early board input.
Staff reported that the city had received five preliminary SB 79 applications for potential downtown housing development. The work-plan discussion also covered wireless facilities, objective standards and design guidelines for unspecified growth areas. City Council had directed that revised California Avenue-area standards return within six to 12 months. Staff anticipated council review of the work plan in September or October, but the available record does not show whether the board authorized its submission.
City receives preliminary Skyline Field Office application
Staff reported that the city received a preliminary architectural review application for a proposed Skyline Field Office for the Midpeninsula Regional Open Space District. The board did not review or act on the project, and no hearing date was reported.
Primary sources