City project tracker165 active projects
Palo Alto Civic
City Projects
Follow major housing, transportation, infrastructure, and public-space projects from proposal through completion.
What is underway
Active projects
165 projects
- 1023 Forest Ave. Historic Home Rehabilitation and RestorationCurrent status: The Historic Resources Board found the rehabilitation and restoration compliant with the Secretary of the Interior’s Standards for Rehabilitation.Last milestone: Oct 10, 2024
- 156 CaliforniaCurrent status: Lot A was added to the Housing Element Sites Inventory, enabling processing of a revised Builder’s Remedy 2.0 application.Last milestone: May 26, 2026
- 2000 Geng Road Recreational Vehicle Safe Parking ExpansionCurrent status: Referenced in a public meetingLast milestone: Oct 20, 2025
- 2008 Measure N Library ProjectsCurrent status: Referenced in a public meetingLast milestone: Aug 10, 2026
- 2197 East Bayhore Road site and design applicationCurrent status: Newly submitted site and design application.Last milestone: May 21, 2026
- 2197 East Bayhore Road townhome developmentCurrent status: Newly submitted site and design application.Last milestone: May 21, 2026
- 3001 El Camino Real Affordable Multifamily Housing Rental ProjectCurrent status: Under construction.Last milestone: Aug 19, 2026
- 3150 El Camino Real Rental DevelopmentCurrent status: Pending streamlined housing-development review; staff review and a CEQA Guidelines Section 15183 infill exemption were still being prepared. A Director decision was anticipated byLast milestone: Dec 15, 2025
- 3200 Park/340 PortageCurrent status: Master Sign Program approved for recommendation to the Director, subject to added conditions.Last milestone: Nov 17, 2025
- 3215 Porter DriveCurrent status: Selected as a 2020-2024 Architectural Review Board Design Award winner.Last milestone: Feb 20, 2025
- 3265 El Camino RealCurrent status: Scheduled for Planning & Transportation Commission consideration on January 15, 2025.Last milestone: Dec 11, 2024
- 3300 El Camino Real mixed-use projectCurrent status: No development application had been submitted as of June 10, 2026.Last milestone: Jun 10, 2026
- 3400 El CaminoCurrent status: Builder Remedy application reported.Last milestone: Sep 19, 2024
- 3606 El CaminoCurrent status: City Council was scheduled to consider the tentative map and development project on April 13, 2026.Last milestone: May 26, 2026
- 366 El Camino developmentCurrent status: A public commenter described the development as expected to come before Council.Last milestone: Jan 20, 2026
- 3781 El CaminoCurrent status: Major Architectural Review application approved by City Council on May 11, 2026.Last milestone: May 26, 2026
- 3950 Fabian WayCurrent status: Recommended for approval subject to ad hoc committee review of five design items.Last milestone: May 1, 2025
- 3997 Fabian Way Housing DevelopmentCurrent status: Reported as submitted on October 8, 2024.Last milestone: Oct 17, 2024
- 405 Kipling Street Historic and Seismic RehabilitationCurrent status: On April 9, 2026, the Historic Resources Board recommended the historic-resource reclassification and found the rehabilitation and seismic retrofit consistent with the Secretary ofLast milestone: Apr 9, 2026
- 4075 El Camino Way projectCurrent status: Scheduled to go to Council on May 5, 2025.Last milestone: May 1, 2025
- 4103 Old Trace Road developmentCurrent status: Tentative Map approved May 18, 2026, subject to conditions of approval.Last milestone: May 18, 2026
- 414 California AvenueCurrent status: Conceptual pre-screening; staff stated that the process does not result in formal action and may precede a formal application.Last milestone: Sep 15, 2025
- 414 California Avenue Mixed-Use DevelopmentCurrent status: Conceptual prescreening completed; a formal development application had not yet been filed as of September 15, 2025.Last milestone: Sep 15, 2025
- 429 Bryant Community CenterCurrent status: Reported open.Last milestone: Aug 19, 2026
- 431 Kipling Street Rehabilitation ProjectCurrent status: On June 12, 2025, the Historic Resources Board unanimously recommended a finding of compliance with the Secretary of the Interior’s Standards for Rehabilitation.Last milestone: Jun 12, 2025
- 4335-4345 El Camino Real Townhome Condominium DevelopmentCurrent status: In streamlined housing development review; a third staff-review round was anticipated following the ARB study session, with a Director's decision to follow.Last milestone: Sep 19, 2024
- 44 and 88 Encina Avenue ProjectCurrent status: Conceptual prescreening; a formal development application is anticipated.Last milestone: Feb 2, 2026
- 51 Encina Avenue RehabilitationCurrent status: Preconstruction phaseLast milestone: Apr 9, 2026
- 540 University Avenue RedevelopmentCurrent status: Preliminary Architectural Review study session completed; no formal approval was requested or granted.Last milestone: Apr 17, 2025
- 588 Webster StreetCurrent status: Selected as a 2020-2024 Architectural Review Board Design Award winner.Last milestone: Feb 20, 2025
- 640 WaverlyCurrent status: On January 16, 2025, the Architectural Review Board recommended approval to the Director of Planning and Development Services, subject to the board's material-color direction.Last milestone: Jan 16, 2025
- 660 UniversityCurrent status: Approved with modifications by City Council on November 10, 2025.Last milestone: Nov 12, 2025
- 70 and Cena projectCurrent status: Continued to a date uncertain pending completion of the environmental analysis.Last milestone: Oct 20, 2025
- 762 San AntonioCurrent status: In the entitlement process; public art is at initial review.Last milestone: Aug 12, 2026
- 788 San Antonio Road Mixed-Use ProjectCurrent status: Conceptual plan forwarded to the Architectural Review Board by a 3-2 Planning & Transportation Commission vote on April 8, 2026.Last milestone: May 21, 2026
- 80 Willow Road projectCurrent status: Referenced in a public meetingLast milestone: Apr 7, 2025
- 800 and 808 San Antonio Road housing projectCurrent status: Tentatively scheduled for the first Planning & Transportation Commission meeting in January 2026.Last milestone: May 7, 2026
- 824 San Antonio RoadCurrent status: Architectural Review Board recommended approval on November 21, 2024, subject to conditions; final Director action was not stated.Last milestone: Nov 21, 2024
- 929 Laurel Glen Drive Single-Family ResidenceCurrent status: Planning & Transportation Commission recommended City Council approval on February 11, 2026.Last milestone: Feb 11, 2026
- Advanced Metering Infrastructure ConversionCurrent status: Approximately 90% complete, with more than 66,000 meters converted to AMI.Last milestone: Sep 3, 2025
- Alester Avenue Storm Drain RehabilitationCurrent status: Bid award pending.Last milestone: Apr 13, 2026
- Alma Charleston ImprovementsCurrent status: Staff is reviewing 35% design plans.Last milestone: Nov 12, 2025
- Alma GardensCurrent status: Rehabilitation work was underway; supplemental FY 2025-26 CDBG funding remained subject to City Council action and the Commission's recommendation for staff to consider reallocatedLast milestone: Jun 9, 2025
- Alternative Housing ProgramCurrent status: Initial analysis and Commission study session completed; staff will develop potential zoning approaches.Last milestone: Apr 8, 2026
- Amateur Radio Emergency Data Network Mobile Platform at Fire Station 8Current status: Proposal phase; staff will return with additional information for an action item.Last milestone: Jan 28, 2025
- Arastradero Creek Permanent Restoration ProjectCurrent status: Long-term repairs and pipeline relocation planning underway.Last milestone: Aug 5, 2026
- Balin Levy RepairCurrent status: Improvement work was proposed for deferral while permitting continues.Last milestone: Sep 8, 2025
- Baylands Golf Links Double-Deck Driving RangeCurrent status: Preliminary feasibility review; no decision to advance the project was made.Last milestone: Jun 23, 2026
- Baylands Golf Links Youth Practice AreaCurrent status: Proposed; subject to a draft long-term capital-partnership term sheet and related safety-net decisions.Last milestone: Nov 25, 2025
- Baylands Main Entrance Gate AutomationCurrent status: Automation equipment installation was complete; signage and roadway markings remained pending.Last milestone: Sep 24, 2024
- Baylands Nature Center Boardwalk RepairsCurrent status: Construction was underway; staff reported that several piles had already been completed.Last milestone: Sep 24, 2024
- Bicycle and Pedestrian Transportation Plan (BPTP) UpdateCurrent status: Final-plan production and plan update contract term extended through December 31, 2026.Last milestone: Mar 9, 2026
- Buena VistaCurrent status: Final Map approved on June 8, 2026.Last milestone: Jun 8, 2026
- Bware Park ProjectCurrent status: On track for completion in fall 2024.Last milestone: Sep 24, 2024
- California Avenue District Master PlanCurrent status: Implementation was included as a FY 2027 public-art education priority.Last milestone: Feb 12, 2026
- California Avenue Streetscape ProjectCurrent status: Referenced in a public meetingLast milestone: Jan 6, 2025
- Caltrain Corridor Quiet Zone ImplementationCurrent status: Staff reported that City Council reviewed a recommendation to install four quad-gate systems.Last milestone: May 11, 2026
- Cameron Park ProjectCurrent status: Completion anticipated in October 2024.Last milestone: Sep 24, 2024
- Car Free Ramona Street ProjectCurrent status: Temporary vehicular closures have been in place since June 2020; Council directed staff in November 2023 to take actions toward permanent closure.Last milestone: Feb 12, 2025
- Center Drive Capacity UpgradesCurrent status: Under construction.Last milestone: Apr 13, 2026
- Charleston-Arastradero Corridor ProjectCurrent status: CompletedLast milestone: May 12, 2025
- Charleston/Meadow and Churchill Rail Grade Separation ProjectsCurrent status: Alternatives are being considered at the 15% design stage during preliminary environmental and engineering work.Last milestone: Aug 12, 2026
- Chimalus PathCurrent status: Concept added to the Bicycle and Pedestrian Transportation Plan and the Capital Improvement Program.Last milestone: May 27, 2026
- Churchill Avenue Bike and Pedestrian ImprovementsCurrent status: Construction was underway.Last milestone: Sep 8, 2025
- City Park-Green Stormwater Infrastructure ProjectCurrent status: Removed off agendaLast milestone: Mar 9, 2026
- City of Palo Alto One Water PlanCurrent status: Referenced in a public meetingLast milestone: Oct 20, 2025
- Community Garden ProgramCurrent status: Ongoing city program with five garden sites and more than 420 plots; staff reported that dedicated program staffing has been restored.Last milestone: Nov 25, 2025
- Comprehensive Plan UpdateCurrent status: Initiation of the update was identified as a Council Tier 2 priority and as a proposed addition to the Commission work plan; final work-plan language remains pending.Last milestone: Jul 8, 2026
- Corporation Way and West Bayshore Road Stormwater Pump Station and Trunk Line ImprovementsCurrent status: Three projects had been completed; staff reported that bids had been secured for three additional projects, including the West Bayshore work.Last milestone: Apr 13, 2026
- Crescent Park Traffic Calming ProjectCurrent status: Deferred to the next fiscal year for Council consideration; Council will decide whether to proceed with 100% design.Last milestone: Aug 12, 2026
- Cubberley Community CenterCurrent status: Staff reported no substantive new update.Last milestone: Aug 19, 2026
- Cubberly artistic activationCurrent status: Council unanimously approved the commission work plan on October 7, 2024, with additional direction to pursue a plan for extensive artistic activation at Cubberly in collaboration,Last milestone: Oct 29, 2024
- Downtown Housing PlanCurrent status: Staff stated it was underway, subject to evaluation of Senate Bill 79 options.Last milestone: Jul 16, 2026
- Downtown MuralsCurrent status: Conceptual design approved; painting is planned for April 2026.Last milestone: Feb 12, 2026
- Downtown Parking Garage ProjectCurrent status: Planned for an upcoming Architectural Review Board meeting.Last milestone: Jun 4, 2026
- El Camino Field Turf ReplacementCurrent status: Construction contract approved.Last milestone: Jan 27, 2026
- El Camino Real Bike Lane and Repaving ProjectCurrent status: Southbound paving was complete; northbound paving was partially complete. Full completion, including striping and signage, was anticipated by November or December 2024.Last milestone: Feb 12, 2025
- El Camino Real Focus AreaCurrent status: Existing Focus Area with potential boundary and development-standard amendments under review.Last milestone: Apr 17, 2025
- Eleanor Pardee Park Restroom InstallationCurrent status: Temporary restrooms were installed January 26, 2026, while the permanent project moves forward; community outreach is planned for mid-2026.Last milestone: Jan 27, 2026
- Embarcadero Road Traffic Signal Operations and ITS Upgrade ProjectCurrent status: Council authorized acceptance of grant funding and amended the Capital Improvement Fund budget for the project.Last milestone: Aug 10, 2026
- Esther Clark Park Tree ReplantingCurrent status: Early planning; phased planting is anticipated over multiple years, with a broader planting plan tentatively expected by late summer or fall 2025.Last milestone: Jan 28, 2025
- Fire Station 4 RenovationCurrent status: Under reconstruction; completion scheduled for June 2027.Last milestone: Aug 19, 2026
- Fire Station 4 ReplacementCurrent status: Potential debt financing was under consideration; no action was taken.Last milestone: Oct 20, 2025
- Fire Station 5 MuralCurrent status: CompletedLast milestone: Mar 19, 2026
- Foothills Nature Preserve ImprovementsCurrent status: Staff is finalizing project design and construction documents and plans to return with a Park Improvements Ordinance recommendation.Last milestone: Jul 28, 2026
- Foothills RebuildCurrent status: Referenced in a public meetingLast milestone: Oct 6, 2025
- Forest CommonsCurrent status: Forwarded to the Architectural Review Board for development-plan review; it is expected to return to the Planning & Transportation Commission and then City Council for final actionLast milestone: Aug 12, 2026
- Gamble Garden Horticultural Complex and Community Room ProjectCurrent status: On August 13, 2026, the Historic Resources Board recommended that the proposed project complies with the Secretary of the Interior’s Standards for Rehabilitation.Last milestone: Aug 13, 2026
- Gas Main Replacement Project 2 (GMR2)Current status: Work was stated to begin later in February 2026 and be completed in summer 2027.Last milestone: Feb 4, 2026
- Gas Main Replacement Project 24BCurrent status: Scheduled for completion by the end of March 2025.Last milestone: Mar 5, 2025
- Gas Main Replacement Project No. 25Current status: In progress.Last milestone: Aug 5, 2026
- Girls middle school relocationCurrent status: Early Architectural Review; no design decision was made.Last milestone: Aug 7, 2025
- Golf Course Net and Artificial Turf Replacement ProjectCurrent status: Planned capital improvement project whose sequencing depends on net-height and second-deck decisions.Last milestone: Nov 25, 2025
- Golf Course Reconfiguration PlanCurrent status: Test-plot performance was evaluated; expanded planting and formal monitoring were planned.Last milestone: May 4, 2026
- Greg Brown muralsCurrent status: Restoration completion was reported.Last milestone: Mar 20, 2025
- Grid Modernization ProgramCurrent status: Ongoing multi-year planning and capital-program initiative.Last milestone: Aug 19, 2026
- Hamilton Avenue Storm Drain Capacity UpgradeCurrent status: Construction contract approved.Last milestone: Oct 6, 2025
- Heritage Park Site ProjectCurrent status: Funding and scope were under review.Last milestone: May 11, 2026
- Historic InventoryCurrent status: Board members are updating the inventory for eventual online publication; staff stated an intern is expected to assist.Last milestone: Apr 9, 2026
- Hoover Park ImprovementsCurrent status: Proposed for FY 2027 design; subject to budget, scope, and schedule changes.Last milestone: Jan 27, 2026
- Horizontal LeveeCurrent status: Reported complete as of January 31; the year was not stated.Last milestone: May 4, 2026
- Housing Element 2023-2031Current status: Housing Element adopted and certified; the ordinance amendments were approved on first reading as implementation measures.Last milestone: Jan 21, 2025
- Housing development at 21000 Gang RoadCurrent status: Planning & Transportation Commission recommended City Council approval, subject to conditions and findings.Last milestone: Mar 19, 2026
- Joint Intercepting Sewer Rehabilitation (Phase 1) ProjectCurrent status: Project closeoutLast milestone: Feb 9, 2026
- King Artist-in-ResidenceCurrent status: The current residency was nearing completion; installation of its King Plaza sculpture was tentatively anticipated around June 13, 2025.Last milestone: May 8, 2025
- Lewis RoadCurrent status: Planned for FY 2027 design and FY 2028 construction after being moved forward from 2029.Last milestone: Apr 13, 2026
- Library Automated Materials Handling System ProjectCurrent status: Construction contract approved.Last milestone: Nov 12, 2024
- Local Advanced Water Purification System ProjectCurrent status: Financing authorization approved by Council on December 16, 2024.Last milestone: Feb 23, 2026
- Lot T Affordable Housing ProjectCurrent status: Under streamlined housing development review; staff anticipated a City Council hearing in August 2026, subject to completion and AB 130 consultation timing.Last milestone: Aug 13, 2026
- MacArthur Park Flagpole Monument RestorationCurrent status: Restoration was reported as completed, with a Veterans Day ribbon-cutting recognition event held.Last milestone: Nov 14, 2024
- Magical BridgeCurrent status: Existing public playground; a 10th-anniversary celebration was announced for the following Saturday.Last milestone: Apr 22, 2025
- Mercedes-Benz dealershipCurrent status: Selected as a 2020-2024 Architectural Review Board Design Award winner.Last milestone: Feb 20, 2025
- Mitchell Dog Park ProjectCurrent status: Substantially complete, with additional benches installed during the week of the meeting.Last milestone: Apr 22, 2025
- Mitchell Park ImprovementsCurrent status: Proposed for FY 2027 design; construction would follow in a later year.Last milestone: Jan 27, 2026
- Mitchell Park Pickleball Court ExpansionCurrent status: Proposed; no formal process or timeline was established.Last milestone: Apr 22, 2025
- Mitchell Park Restroom InstallationCurrent status: Construction contract approved.Last milestone: Jul 28, 2026
- Nature Connectivity Ad Hoc Committee EffortsCurrent status: In progress; the Ad Hoc reported it had largely reviewed existing Palo Alto policies and plans and had begun evaluating regional practices.Last milestone: Jul 28, 2026
- New Road Bridge Replacement ProjectCurrent status: Construction initiation celebration scheduled for May 21, 2026.Last milestone: May 27, 2026
- Nobu restaurantCurrent status: Selected as a 2020-2024 Architectural Review Board Design Award winner.Last milestone: Feb 20, 2025
- Open Space Interpretive CenterCurrent status: Early-stage design and fundraising were reported.Last milestone: Apr 28, 2026
- Palo Alto Avenue Grade SeparationCurrent status: Funding source and permissible use require staff follow-up.Last milestone: Sep 8, 2025
- Palo Alto Avenue Quiet Zone ProjectCurrent status: Medians were installed at the end of 2025, making the location eligible for a quiet-zone implementation application.Last milestone: May 11, 2026
- Palo Alto CommonsCurrent status: Scheduled for City Council consideration on May 5, 2025, according to the board discussion.Last milestone: May 11, 2026
- Palo Alto Fiber ExpansionCurrent status: Early-adopter installations underway; a fiber hut was completed earlier in 2026.Last milestone: Aug 5, 2026
- Palo Alto HomekeyCurrent status: Staff proposed completion in 2026.Last milestone: Aug 19, 2026
- Palo Alto Skate ParkCurrent status: Limited activity was reported; a lead participant had reportedly emerged.Last milestone: Jul 28, 2026
- Palo Alto Transit Center Long-Term PlanningCurrent status: Urban Land Institute stakeholder interviews and analysis were scheduled for October 19-24, 2025.Last milestone: Sep 29, 2025
- Potential redevelopment of parcels adjacent to Town & CountryCurrent status: City Council completed a pre-screening on February 2, 2026; a formal application was anticipated.Last milestone: Feb 11, 2026
- Project at 4130 Old Trace RoadCurrent status: Streamlined housing review application was deemed complete in late February 2026; the Architectural Review Board held a study session on March 5, 2026. The vesting tentative map isLast milestone: May 13, 2026
- Public Safety BuildingCurrent status: Partially occupied; remaining transition activities were planned through early 2026.Last milestone: Aug 19, 2026
- Public Works ADA Curb Ramp Improvement ProjectCurrent status: Staff expected work on 88 curb ramps to begin in September or fall 2024.Last milestone: Sep 12, 2024
- Quarry Road Improvements and Transit Center Access projectCurrent status: Staff listed implementation as a proposed 2026 objective.Last milestone: Jun 8, 2026
- Ramos Park Playground Renovation ProjectCurrent status: Substantially complete, with final touches remaining; opening anticipated within the next few weeks.Last milestone: Mar 25, 2025
- Ramos Park Restroom ProjectCurrent status: Complete and open for public use.Last milestone: Sep 24, 2024
- Reach 2Current status: Alternatives evaluation and preliminary feasibility studies are underway; no preferred alternative had been selected.Last milestone: Aug 19, 2026
- Reed StreetCurrent status: Acquired February 1, 2023; rehabilitation and tenant-leadership development were ongoing.Last milestone: Sep 11, 2025
- Regional Water Quality Control Plant Long Range Facilities Plan UpdateCurrent status: Undergoing a rebuild.Last milestone: Aug 10, 2026
- Roth Building Fresco Phase II Restoration ProjectCurrent status: The upper color panels and gray panel above the entrance were restored; treatment planning remains for the compromised lower grisaille panels.Last milestone: Jun 18, 2026
- Roth Building Rehabilitation Phase ICurrent status: FY 2026 appropriation technical clean-up approved.Last milestone: Oct 6, 2025
- SD System Replacement & RehabilitationCurrent status: Contract amendments approved June 9, 2025.Last milestone: Apr 13, 2026
- Safe Streets Action PlanCurrent status: A consultant's draft action plan or work product was not ready for presentation at this meeting.Last milestone: Jan 29, 2025
- Salt Pond Restoration ProjectCurrent status: Pond A2W was completed and a portion of the Bay Trail was opened.Last milestone: Feb 24, 2026
- San Antonio Road Area PlanCurrent status: Phase 1 existing-conditions review; alternatives are expected to be developed next, with plan completion anticipated in 2028.Last milestone: Aug 19, 2026
- Second transmission corridorCurrent status: Approximately 1,200 feet of conduit work, about 2% of the project, remained as of June 3, 2026.Last milestone: Aug 5, 2026
- Secondary Treatment Upgrades projectCurrent status: Staff described the upgrades as supported by a $192 million state revolving fund loan at 0.8% interest.Last milestone: Aug 19, 2026
- Senate Bill 79 ImplementationCurrent status: State law becomes effective July 1, 2026; the City had not selected an alternative-plan approach.Last milestone: Oct 22, 2025
- Shared Micromobility Program in Palo AltoCurrent status: A feasibility study was proposed and Commission feedback was received; no formal authorization or implementation decision occurred at this meeting.Last milestone: Oct 30, 2024
- Sherman Avenue Parking Garage Temporary Mural ProjectCurrent status: Funding for permanent mounting hardware and the first temporary mesh-banner artwork was approved on February 12, 2026.Last milestone: Apr 16, 2026
- Skyline Field OfficeCurrent status: A preliminary architectural review application was received.Last milestone: Jul 16, 2026
- South Palo Alto Bikeways Demonstration ProjectCurrent status: Identified for the Commission's anticipated May agenda.Last milestone: May 4, 2026
- South of Forest Area Coordinated Area PlanCurrent status: Staff stated that the effort was expected to begin in the next few months; timing for ARB review was not yet established.Last milestone: Apr 17, 2025
- Southern Palo Alto Bike/Pedestrian Railroad Crossing Alternatives AnalysisCurrent status: City Council narrowed eight alternatives to Alternative A near El Dorado Avenue and directed staff to advance two variants: A1 and A2.Last milestone: Aug 12, 2026
- Stanford GUP (Stanford Next)Current status: A regional workshop on affordable-housing locations was completed; participants are on hiatus while a draft is prepared.Last milestone: May 11, 2026
- Street Maintenance ProjectCurrent status: FY 2027 SB 1 project-list resolution adopted.Last milestone: May 18, 2026
- Sushi RokuCurrent status: Selected as a 2020-2024 Architectural Review Board Design Award winner.Last milestone: Feb 20, 2025
- Sustainability and Climate Action Plan (S/CAP)Current status: Implementation underway under the 2023–2025 work plan.Last milestone: Mar 9, 2026
- The LinkCurrent status: Youth Council members provided feedback on the layout, amenities, furniture, programs, workshops, and events for the planned space.Last milestone: Feb 24, 2026
- Traffic Garden projectCurrent status: Underway; staff hoped for completion in September 2025 and confirmed the facility was on track to open in fall 2025.Last milestone: Sep 29, 2025
- Trolley Battery Energy Storage SystemCurrent status: City Council approved the third-phase agreement; staff said the standalone battery-storage agreement was executed and is moving forward.Last milestone: Oct 1, 2025
- University Avenue Underpass MuralCurrent status: Project launch funding approved; staff was still developing stakeholder input, artist-selection options, materials, and design approach.Last milestone: Jun 18, 2026
- VTA Speed & Reliability ProgramCurrent status: Phase-one community engagement on transit signal priority was concluding; VTA planned further fare-payment outreach in March and April 2025 and anticipated a pilot in summer 2025.Last milestone: Jan 29, 2025
- Valley Water Tidegate ProjectCurrent status: The sluice gate is stuck closed and its motorized system is nonfunctional. The City has submitted a permit application for cleaning, an underwater condition assessment, and initialLast milestone: May 26, 2026
- Virginia ApartmentsCurrent status: Exterior work was complete and interior rehabilitation had commenced.Last milestone: Sep 11, 2025
- Wildcat Solar 100 Megawatt ProjectCurrent status: Joint procurement under negotiation.Last milestone: Apr 7, 2025
- Wilton CourtCurrent status: Selected as a 2020-2024 Architectural Review Board Design Award winner.Last milestone: Feb 20, 2025